Project: Custom Home Build

The 3 stall garage started out with surveying the land and determining the best location for the structure. Excavation of the land with backhoes level the land for the concrete floor pour. The next phase is framing the walls, adding roof joices and plywood to the exterior walls and roof for structural support. Once framing is completed the windows, grange doors, siding and roof shingles are installed along with power for the interior and exterior lights. Once complete the final rock siding is added which completes this large size structure.